UD75 Configuration
  1. Isolate the drive from the mains supply and allow 5 minutes for the DC Bus capacitors to discharge.
  2. Insert Large Option Module as shown below. Ensure that it is correctly inserted. The module will click firmly into place.
  3. To remove the module, pull on the black tab, and the module will disengage from the connector and pull out of the drive.
UD75 Configuration: Cable Screen
The screen of the cable at every node on the network MUST be connected to the screen terminal (pin 3) on the CTNet terminal block. When the screen is stripped back to connect the twisted pair to the CTNet terminals, keep the exposed section of the cable as short as possible. On the CTNet PC Interface Adapter Card, there is no screen terminal. The screen should be cut and taped back to prevent it coming into contact with any other surfaces. The on-board terminal resistor should not be connected.
UD75 Configuration: Network Termination
The network MUST be fitted with terminating resistors AT BOTH ENDS!!! If resistors are not fitted, the network appear to work OK, but the noise immunity of the network will be drastically reduced. The terminating resistor value should match the nominal characteristic impedance value for the cable; in the case of the customized CTNet cable, the terminating resistors used should be nominally 78Ω. PC ISA and PCMCIA cards for interfacing a PC to CTNet are available from CT SSPD.

For price and ordering info you can email sales@mroelectric.com or call 1-800-691-8511. We have these and all the other Control Techniques Unidrive Classic option modules in stock, along with the drives themselves.

UD75 Configuration
Joe Kaminski

Joe Kaminski is an industrial automation specialist at MRO Electric. He has a background in industrial engineering and supply chain management. Joe has worked in the automation industry for over 10 years providing support to some of the largest companies in the world. For more info, visit www.mroelectric.com.

Share
Published by
Joe Kaminski

Recent Posts

End of Year Maintenance

End of Year Maintenance As the year comes to a close, it’s the perfect time…

2 days ago

Beginner’s Guide to Programming an Allen-Bradley PLC

Allen-Bradley Programmable Logic Controllers (or PLC) remain widely used in industrial automation. Programming their PLCs…

2 weeks ago

The Most Popular U.S. College Mascots

The game is almost over, and your team is losing. You can feel the crowd’s…

2 weeks ago

Every State’s Favorite OREO

Whether you’re loyal to the classic, double stuf, or thin OREOs, the addicting cookies always…

3 weeks ago

Legal and Safety Requirements Regarding Arc Flashes

Arc flash incidents are among the most dangerous hazards in the electrical industry, posing serious…

1 month ago

Understanding an Arc Flash

Understanding an Arc Flash An arc flash stand as one of the most dangerous electrical…

2 months ago